State of Florida |
Public Service Commission Capital Circle Office Center ● 2540 Shumard
Oak Boulevard -M-E-M-O-R-A-N-D-U-M- |
||
DATE: |
|||
TO: |
Office of Commission Clerk (Teitzman) |
||
FROM: |
Division of Engineering (M. Watts, Knoblauch) Division of Accounting and Finance (Norris, Sewards) Division of Economics (Ramos) Office of the General Counsel (Schrader) |
||
RE: |
|||
AGENDA: |
02/04/20 – Regular Agenda – Proposed Agency Action for Issues 2 through 7 – Interested Persons May Participate |
||
COMMISSIONERS ASSIGNED: |
|||
PREHEARING OFFICER: |
|||
02/13/20 (Statutory deadline for original certificate pursuant to Section 367.031, Florida Statutes) |
|||
SPECIAL INSTRUCTIONS: |
|||
River Grove Utilities, Inc. (River Grove or Utility) is located in Brevard County, Florida. Based on its application, the Utility provides water and wastewater service to 168 residential customers, two offices, and two clubhouses within the River Grove Mobile Home Village. According to the Florida Department of Environmental Protection (DEP) documents, the water and wastewater systems were built in the 1970s to service the mobile home park. Since that time, River Grove Mobile Home Village, Inc. (RGMHV) has included the cost of providing water and wastewater service to the residents of the mobile home park (MHP) in the rent. Therefore, pursuant to Section 367.022(5), Florida Statutes (F.S.), RGMHV has been exempt from Florida Public Service Commission (Commission) regulation.
In 2014, the potable water system began experiencing problems meeting drinking water standards for color, total dissolved solids, and total trihalomethanes. Alternative water treatment methods were considered, but it was determined that the least costly alternative would be to connect to the Brevard County’s Barefoot Bay water system and purchase bulk water service from Barefoot Bay. In 2016, the DEP issued a consent order that directed RGMHV to take the actions necessary to effect the interconnection with Barefoot Bay, and gave it a two-year time frame to complete. RGMHV sought funding through a DEP state revolving fund program for the water main extension required to interconnect the two systems. After some delays with the funding and permitting, the interconnection was completed in March 2019. RGMHV created River Grove Utilities, Inc. to own and operate the water and wastewater systems, function as a utility separate from the mobile home park, and bill for water and wastewater service. River Grove installed individual water meters at each lot and proposed to collect revenues based on metered usage.
Pursuant to Section 367.031, F.S., the Commission shall grant or deny an application for a certificate of authorization within 90 days after the official filing date of the completed application. The application was deemed complete on November 15, 2019, which is considered the official filing date.
This recommendation addresses the application for original water and wastewater certificates and the appropriate rates and charges for the Utility. The Commission has jurisdiction pursuant to Sections 367.031 and 367.045, F.S.
Issue 1:
Should the application for water and wastewater certificates by River Grove be approved?
Recommendation:
Yes. Granting the application is in the public interest and River Grove should be granted Certificate Nos. 674-W and 575-S to serve the territory described in Attachment A, effective the date of the Commission’s vote. The resultant order should serve as River Grove’s water and wastewater certificates and it should be retained by the Utility. (M. Watts, Knoblauch, Sewards)
Staff Analysis:
On July 25, 2019, River Grove filed its application for original water and wastewater certificates in Brevard County, Florida. Upon review, staff determined the original filing was deficient and sent a deficiency letter on August 16, 2019. Staff also sent data requests to the Utility seeking additional information. River Grove corrected the deficiencies on November 15, 2019, which is considered the official filing date for the application. The Utility’s application is in compliance with the governing statutes, Sections 367.031 and 267.045, F.S.
Notice
On October 24 and November 15, 2019, River Grove filed proof of compliance with the noticing provisions set forth in Rule 25-30.030, Florida Administrative Code (F.A.C.). One customer filed a letter in opposition to the rates on November 8, 2019. Staff reached out to the customer by telephone, leaving a voicemail, and by letter, to ask whether he wished to merely note his objection or to request an administrative hearing. The customer did not respond to these inquiries. No other protest was filed during the protest period and the time for filing objections has passed.
Land Ownership and Service Territory
River Grove provided adequate service territory and system maps, and a territory description as required by Rule 25-30.033, F.A.C. The legal description of the service territory is appended to this recommendation as Attachment A. The application contained a copy of the warranty deed for the wastewater treatment plant site that will be executed and recorded upon the Commission’s approval of the application.
Financial and Technical Ability
Rule 25-30.033(1)(h) and (i), F.A.C., requires a statement providing the financial and technical ability of the applicant to provide service, a detailed financial statement, and a list of all entities upon which the applicant is relying to provide funding along with those entities’ financial statements. As a new business entity, River Grove is relying upon the financial backing of its parent, RGMHV. The existing water and wastewater infrastructure has been owned and operated by RGMHV since the 1970s. The Commission has traditionally allowed reliance on the parent’s
financial ability in similar situations.[1] The Commission’s reasoning has been the logical vested interest of a parent in the financial stability of its subsidiary. The application contains RGMHV’s most recent financial statements. Additionally, the application includes the loan agreement for the Florida Department of Environmental Protection State Revolving Fund (SRF) loan, which financed the construction of the Utility’s interconnection with Barefoot Bay to purchase bulk water. Staff believes that RGMHV’s financial statements demonstrate adequate and stable funding reserves for the Utility. Therefore, staff recommends that River Grove has demonstrated that it will have access to adequate financial resources to operate the Utility.
Regarding technical ability, the Utility stated in its application that it has owned and operated the subject water and wastewater systems since the 1970s. River Grove also stated that its systems will be operated consistent with an operations agreement with U.S. Water Services Corporation. Following the interconnection with Barefoot Bay, River Grove appears to have no outstanding compliance issues on file with the DEP, and is current with its monitoring requirements.
Conclusion
Based on the foregoing, staff recommends that granting River Grove’s application is in the public interest. River Grove should be granted Certificate Nos. 674-W and 575-S to serve the territory described in Attachment A, effective the date of the Commission’s vote. The resultant order should serve as River Grove’s water and wastewater certificates and it should be retained by the Utility.
Issue 2:
What are the appropriate water and wastewater rates and return on investment for River Grove?
Recommendation:
The recommended monthly water and wastewater rates, as shown on Schedule No. 4 attached to this recommendation, are reasonable and should be approved. The Utility should file revised tariff sheets and a proposed customer notice to reflect the Commission-approved rates. The approved rates should be effective for service rendered on or after the stamped approval date on the tariff sheets pursuant to Rule 25-30.475(1), F.A.C. The approved rates should not be implemented until staff has approved the proposed customer notice and the notice has been received by customers. The Utility should provide proof of the date notice was given within 10 days of the date of the notice. A return on equity of 10.55 percent, with a range of plus or minus 100 basis points, should also be approved. (Ramos, Sewards, M. Watts, Knoblauch)
Staff Analysis:
Within its application, the Utility provided the appropriate information pursuant to Rule 25-30.033(1)(p), F.A.C., to support its proposed rates and charges. In the instant case, the Utility’s water and wastewater facilities are currently in operation. Therefore, the requested rates and charges in the application are based on actual operating costs of the existing systems. This is consistent with the Commission’s policy for setting initial rates and charges.
Rate Base
Consistent with Commission practice in applications for original certificates, rate base is identified only as a tool to aid in setting initial rates and is not intended to formally establish rate base. The Utility’s proposed water and wastewater rate base calculations, as well as staff adjustments, are described below.
The Utility proposed plant in service balances, inclusive of land, of $1,141,146 for water and $41,676 for wastewater in its filing. The filing indicated a land balance of $2,250 for the water system and $2,250 for the wastewater system. However, the wastewater balance of Account No. 351—Organization also included the land balance. As such, staff has made an adjustment to decrease wastewater plant in service by $2,250 to remove the duplicative costs.
As part of its proposed plant in service, the Utility proposed $1,045,994 for its Potable Water Main Extension Project for interconnection with the Barefoot Bay water system. Based on updated information provided by the Utility, staff has made an adjustment to decrease water plant in service by $44,559 to remove duplicative costs.
Based on the adjustments above, staff recommends a reduction to River Grove’s projected plant in service of $44,559 for water and $2,250 for wastewater. As such, staff recommends an adjusted projected plant in service, inclusive of land, of $1,096,587 for water and $39,426 for wastewater.
River Grove proposed an accumulated depreciation balance of $37,492 for water and $17,873 for wastewater. The Utility’s projection is based on the accumulated depreciation of existing plant, as well as the use of a half-year convention for the requested pro forma projects. As the pro forma projects were completed in March 2019, staff believes it is reasonable to include a full year of accumulated depreciation in rate base.
Additionally, a corresponding adjustment should be made to the water system to reflect adjustments to plant in service, as discussed above. Based on the above, staff recommends increasing accumulated depreciation by $18,737 for the water system and $216 for the wastewater system. As such, staff recommends an accumulated depreciation balance of $56,229 for water and $18,089 for wastewater.
In its filing, River Grove proposed Contributions In Aid of Construction (CIAC) balances of $837,564 for water and $0 for wastewater. The CIAC balance for water includes estimated potential principal forgiveness in the amount of $776,848, as identified in the SRF loan agreement between the DEP and RGMHV. According to the loan agreement, the DEP is authorized to allow principal forgiveness on loans funded by the Federal Drinking Water Act for projects that meet the requirements of the Act. Also, the CIAC for water includes a balance of $60,716, based on a proposed service availability charge of $353 per customer for meter installation. However, through correspondence with staff, the Utility indicated that all meters were already installed and that the proposed service availability charge would be collected prospectively if there is development of the adjacent property. As such, staff made an adjustment to decrease CIAC for water by $60,716. Based on the above, staff recommends CIAC balances of $776,848 for water and $0 for wastewater.
River Grove proposed an accumulated amortization of CIAC balance of $11,633 for water and $0 for wastewater. Staff recommends the inclusion of a full year of accumulated amortization of CIAC collected related to the pro forma projects, consistent with the recommended adjustment to accumulated depreciation, discussed above. Additionally, staff recommends an adjustment to recognize the removal of the meter installation charges. These adjustments result in an increase of $9,946 to accumulated amortization of CIAC for the water system. As such, staff recommends an accumulated amortization of CIAC balance of $21,579 for water and $0 for wastewater.
The Utility calculated a working capital allowance of $15,124 for water and $18,189 for wastewater based on one-eighth of the estimated operation and maintenance (O&M) expense for each system. Staff recommends an increase of $1,513 for water and a decrease of $6,206 for wastewater, to reflect staff’s recommended adjustments to O&M expense discussed below. Staff’s recommended adjustments result in a working capital allowance of $16,637 for water and $11,983 for wastewater.
In total, River Grove proposed a rate base of $292,847 for water and $41,992 for wastewater. Based on the adjustments discussed above, staff recommends that the rate base be increased $8,879 for water and decreased $8,672 for wastewater. As such, staff recommends an adjusted rate base of $301,726 for water and $33,320 for wastewater should be approved. Rate base calculations for the water and wastewater systems are shown on Schedule Nos. 1-A and 1-B, respectively. Staff’s adjustments are shown on Schedule No. 1-C.
Cost of Capital
The Utility’s application contained a schedule of the Utility’s capital structure. River Grove projected long-term debt of $229,209, which consisted of the SRF loan balance that was not included in the principal forgiveness. The Utility also projected common equity of $54,964 consisting of paid in capital from RGMHV. River Grove also made an adjustment to reduce common equity by $2,100 to reconcile proposed total capital with the Utility’s requested rate base. However, it is Commission practice to reconcile all investor sources of capital, which includes long-term debt, to the approved rate base.[2] This methodology results in pro rata adjustments to decrease long-term debt by $1,513 and common equity by $363.
River Grove proposed a return of equity (ROE) of 10.93 percent, based on the leverage formula in effect at the time of filing. However, staff recommends the Utility’s ROE be based on the current leverage formula in effect. Using the current leverage formula, the ROE should be 10.55 percent.[3] As such, staff recommends an overall cost of capital of 2.52 percent. The appropriate ROE for River Grove is 10.55 percent, with a range of plus or minus 100 basis points, as shown on Schedule No. 2.
Net Operating Income
River Grove calculated net operating income (NOI) of $7,416 for water and $1,063 for wastewater. Based on staff’s adjustments above, staff calculated an NOI of $7,614 for water and an NOI of $841 for wastewater. The calculated NOI for the water and wastewater systems are shown on Schedule Nos. 3-A and 3-B, respectively.
Operation and Maintenance Expense
The Utility proposed total O&M expenses of $120,994 for water and $145,513 for wastewater. Staff believes adjustments are necessary, as addressed below.
Salaries and Wages Expense – Employees
River Grove projected salaries and wages – employees expense of $0 for water and $68,533 for wastewater. In response to staff’s first data request, the Utility updated its request to a total of $176,800, or $88,400 for each system. River Grove stated that the updated request includes two positions. The first position would be a superintendent/mechanic employee, with a salary of $83,200, responsible for meter reading, general operations monitoring, oversight of the contract operator, and day-to-day maintenance. The second position would be a part-time director, with a salary of $93,600, responsible for oversight of operations, maintenance, and administration. Staff notes that the Utility has also requested contractual services expense for billing, meter reading, reporting to the Commission, and handling phone calls for the Utility.
Staff agrees that the requested superintendent/mechanic position is reasonable for day-to-day operations of the Utility. Staff requested an explanation of how the Utility developed the salary estimate for this position, and the Utility only provided an hourly rate with no further explanation. In order to gauge the reasonableness of the requested salary, staff reviewed the American Water Works Association 2018 Utility Salary Compensation Survey for Small Water and Wastewater Utilities and identified a position, Small System Manager, which is representative of the requested superintendent/mechanic position’s duties. The mid-point of the range for this salary is $68,521. As such, staff believes the Utility’s original salary request of $68,533 is an appropriate projection for this position. However, staff recommends allocating the salary to both systems, per the Utility’s updated request. As such, staff recommends that the requested superintendent position, with a salary of $68,533, allocated equally between the water and wastewater systems ($34,267 per system), should be approved.
Staff believes the responsibilities of the requested director position would be duplicative of those assigned to the superintendent, as well as the functions attributed to contractual services. As a result, staff recommends that the requested director position should not be approved.
Based on the above, staff has calculated an adjustment from the Utility’s original request to increase salaries and wages – employees expenses by $34,267 for the water system, and to decrease the expense by $34,267 for the wastewater system. This results in a recommended salaries and wages – employees expense of $34,267 for the water system and $34,267 for the wastewater system.
Purchased Power Expense
River Grove projected 2019 wastewater purchased power expense of $17,954, based on the average of this expense for 2015, 2016 and 2017. In response to staff’s data request, River Grove provided documentation showing purchased power expenses incurred in 2018. Given the variance of purchased power expenses from year-to-year, staff believes the use of a four-year average based on 2015 to 2018 is appropriate. Additionally, the Utility included a 2.48 percent increase to account for inflation of expenses. As the four-year averages are based on costs incurred from 2015 to 2018, staff believes this is a reasonable adjustment given that it is comparable to the 2019 Price Index percentage of 2.36 percent authorized by the Commission. Based on the above, staff has calculated an adjustment to decrease purchased power expenses by $925 for the wastewater system. This results in recommended purchased power expenses of $17,029 for the wastewater system.
Materials and Supplies, Transportation, and Insurance Expense
River Grove projected materials and supplies, transportation, and insurance expenses based on an average of allocated costs incurred in 2015, 2016, and 2017. The Utility only projected materials and supplies expense for the wastewater system. In response to a staff data request, the Utility provided documentation showing costs incurred in 2018. As discussed above, staff believes the use of a four-year average based on 2015 to 2018, including a 2.48 percent increase for inflation of expenses, is appropriate. Based on the above, staff has calculated an adjustment to decrease these expenses by a total of $672 for the water system and $1,494 for the wastewater system.
Contractual Services Expense
The Utility proposed contractual services expenses of $42,619 for the water system and $43,718 for the wastewater system. River Grove’s contractual services expense is comprised of administrative fees, customer billing and collections fees, lab fees, and meter reading software maintenance fees.
River Grove estimated administrative fees of $21,738, split evenly between the water and wastewater systems at $10,869 each. Additionally, the Utility estimated meter reading software maintenance fees of $950 for the water system only. Staff believes these proposed fees are reasonable. Based on the above, staff recommends total administrative fees of $21,738, split evenly between the water and wastewater systems at $10,869 each. Further, staff recommends total maintenance fees of $950 for the water system only.
The Utility projected total customer billing and collection fees of $61,600, split evenly between the water and wastewater systems at $30,800 each. The total fees are comprised of meter reading costs of $20,640, billing and collection costs of $30,960, and a cost of $10,000 for annual reporting to the Commission. In its initial response to staff’s first data request, the Utility stated these administrative services would be provided by RGMHV. In a subsequent response, River Grove stated its proposed customer billing and collection fees were based on an agreement with the company Rents. However, the Utility was unable to provide a written contract or agreement between the Utility and Rents. Given the relatively large amount of the fees for a utility of River Grove’s size, staff reviewed the reasonableness of the requested expenses as discussed below.
River Grove estimated monthly meter reading costs at $10 per customer for a total of $20,640 annually (172 x $10 x 12). In Order No. PSC-2016-0537-PAA-WU, the Commission determined a meter reading charge of $3.06 per customer to be reasonable.[4] Staff believes this is an appropriate proxy to use as it was based on a quote for meter reading services from an independent third party. Additionally, to account for inflation of expenses since the issuance of the abovementioned Order, staff increased the charge to $3.20 using the Commission-approved price index percentages for water and wastewater utilities. Based on the above, staff has calculated meter reading costs of $6,608 (172 x $3.20 x 12).
The Utility estimated monthly billing and collection costs at $15 per customer for a total of $30,960 annually (172 x $15 x 12). To determine a reasonable monthly billing and collection charge, staff reviewed the cost justification River Grove provided for late fees included in Exhibit 23B of its application. The Utility listed clerical labor, supervisor labor, printing supplies, and postage at a total of $7.60 per late fee. Staff believes this is a reasonable starting point to use for general billing and collection activities. Staff used the clerical labor, printing supplies, and postage components to formulate a recurring monthly per customer charge. Clerical labor per customer would include the time to create and send bills, to collect and process payments, as well as provide for possible communication with customers for billing questions or issues. This results in monthly billing and collection costs of $5.60 per customer. Based on the above, staff has calculated billing and collection costs at $11,558 (172 x $5.60 x 12).
River Grove included an annual cost of $10,000 for reporting to the Commission. Staff reviewed recent cases that have come before the Commission involving Class C utilities of similar size to review the reasonableness of this request. Staff located 2019 invoices from an independent third party, which included the preparation and review of annual reports. The invoices reflected the expense for several Class C utilities, with a range of approximately $143 to $285. As such, staff believes it is appropriate to limit River Grove’s request to the top of the range. Staff recommends $285 as an appropriate annual cost for reporting to the Commission.
Based on the above, staff recommends total customer billing and collection fees of $18,452 ($6,608 + $11,558 + $285), split evenly between the water and wastewater systems at $9,226 each.
River Grove projected lab fees of $2,049 for the wastewater system. The Utility based its proposed lab fees on an average of costs incurred in 2015, 2016, and 2017. In response to a staff data request, the Utility provided documentation showing costs incurred in 2018. As discussed above, staff believes the use of a four-year average based on 2015 to 2018, including a 2.48 percent increase for inflation of expenses, is appropriate. Based on the above, staff recommends total lab fees of $2,129.
The Utility also provided a signed updated contract with U.S. Water Services Corporation for operations of the wastewater treatment plant. Although the cost of this contract was not included in the Utility’s calculation, staff believes it should be included in contractual services as the company is performing necessary functions to operate the wastewater treatment plant. As such, staff recommends that $8,937 should be included in contractual services for the wastewater system.
Based on the above, staff recommends total contractual services expense of $21,045 for the water system and $31,161 for the wastewater system. This results in an adjustment to decrease contractual services expense by $21,574 for the water system, and $12,557 for the wastewater system.
Miscellaneous Expense
River Grove projected miscellaneous expense of $2,296 for both the water and wastewater system. The Utility used a three-year average to base its projected miscellaneous expense, using the average of costs incurred in 2015, 2016, and 2017. As with the other expenses, staff received documentation reflecting the costs incurred in 2018. As discussed above, staff believes the use of a four-year average based on 2015 to 2018, including a 2.48 percent increase for inflation of expenses, is appropriate. This results in a decrease of $406 to the miscellaneous expense for both the water and wastewater systems. Additionally, an expense of $2,440 for Full System and Software Training for the meters installed as part of the Potable Water Main Extension Project was included in Account 334 – Meters. This amount was removed from Account 334 and moved to Account 675 – Miscellaneous Expenses to be amortized over five years. This results in an increase of $488 for the water system. As such, staff recommends that the Utility’s projected miscellaneous expense be increased by $82 (-$406 + $488) for water and decreased by $406 for wastewater.
O&M Expense Summary
Based on the above adjustments, staff recommends that projected O&M expense be increased by $12,102 for water and decreased by $49,648 for wastewater, resulting in total O&M expense of $133,096 for water and $95,865 for wastewater.
Depreciation and CIAC Amortization Expense
River Grove reflected depreciation expense, net of CIAC amortization, of $8,964 for water and $546 for wastewater. Based on staff’s adjustments to rate base, corresponding adjustments should be made to increase net depreciation by $4,084 for water and decrease by $56 for wastewater. These adjustments result in net depreciation expense of $13,048 for water and $490 for wastewater.
Taxes Other Than Income
In its filing, River Grove included taxes other than income (TOTI) expense of $22,769 and $7,294 for water and wastewater, respectively. These total amounts included property tax expense of $15,485 and $334 for water and wastewater, respectively. River Grove’s calculation of proposed property tax expense for each system was based on net plant that included the balance of Account Nos. 301 and 351—Organization. As this account is considered intangible plant, staff removed these balances from the calculations. Based on this adjustment, as well as a corresponding adjustment to reflect staff’s adjustments to rate base, staff recommends decreasing property tax expense by $1,460 for water and $334 for wastewater.
In addition, as discussed below, staff is recommending an adjustment to the Utility’s projected revenues. As a result, TOTI should be increased by $825 for water and decreased by $2,378 for wastewater to reflect regulatory assessment fees of 4.5 percent on the change in revenues. Therefore, staff recommends TOTI of $22,134 ($22,769 - $1,460 + $825) for water and $4,582 ($7,294 - $334 - $2,378) for wastewater.
Income Taxes
River Grove proposed income taxes of $1,715 for water and $246 for wastewater. Based on staff’s adjustments to NOI, staff recommends increasing income taxes by $2,576 for water and decreasing income taxes by $212 for wastewater. Therefore, staff recommends income taxes of $4,291 for water and $34 for wastewater.
Revenue Requirement
The Utility proposed revenue requirements for water and wastewater of $161,858 and $154,662, respectively. Staff recommends adjusted revenue requirements of $180,183 for water and $101,811 for wastewater to be used to set initial rates for service. The Utility’s projected revenue requirements include O&M expenses, depreciation and amortization expense, taxes other than income, income taxes, as well as a return on investment. The recommended revenue requirements will allow the Utility the opportunity to recover its expenses and earn a 2.52 percent return on its investment in rate base, as shown on Schedule Nos. 3-A and 3-B, respectively. Staff’s adjustments are shown on Schedule No. 3-C.
Rates and Rate Structure
The Utility provides water and wastewater service to 168 residential customers, two offices, and two clubhouses within the River Grove Mobile Home Village. The Utility indicated that all customers have 5/8 inch x 3/4 inch meters. Furthermore, the Utility indicated that there are currently four vacant mobile home lots which when occupied, will have 5/8 inch x 3/4 inch meters. The Utility currently does not have established rate structures and rates for its water and wastewater services; however, utility services are a component of the total monthly lot rent.
The Utility’s proposed rate structures and rates, consisting of base facility and gallonage charges, for its water and wastewater system, are shown below in Table 2-1. The Utility allocated service revenues to the base facility charge (BFC) of approximately 44 percent for water and 75 percent for wastewater. The Utility additionally proposed a residential wastewater cap of 10,000 gallons. Staff believes the Utility’s rate structure, consisting of base facility and gallonage charges, is reasonable. However, in a data request, the Utility indicated that the customers are not seasonal, and therefore, staff believes the Utility’s proposed BFC allocations should be reduced to 40 percent for water and 50 percent for wastewater based on Commission practice. Furthermore, staff does not recommend a residential wastewater cap in this instant proceeding because the necessary consumption data in order to determine the appropriate cap is not readily available. The appropriate residential wastewater cap should be evaluated by staff in a subsequent rate proceeding in which a detailed billing analysis is audited and can be analyzed. As a result, staff’s recommended rate structure and rates for River Grove’s water and wastewater systems are shown in Table 2-1.
Table 2-1
River Grove’s Water and
Wastewater Rates
|
Utility Proposed |
Staff Recommended |
||
|
Water |
Wastewater |
Water |
Wastewater |
Base Facility Charge |
$34.20 |
$56.07 |
$34.92 |
$24.66 |
|
|
|
|
|
Gallonage Charge |
|
|
|
|
Charge per 1,000 gallons |
$6.03 |
$2.57 |
$7.15 |
$3.36 |
|
|
|
|
|
Typical Residential 3/4” Meter Bill Comparison |
||||
3,000 gallons |
$52.29 |
$63.78 |
$56.37 |
$34.74 |
5,000 gallons |
$64.35 |
$68.92 |
$70.67 |
$41.46 |
7,000 gallons |
$76.41 |
$74.06 |
$84.97 |
$48.18 |
Conclusion
Based on the above, the recommended monthly water and wastewater rates, as shown on Schedule No. 4, are reasonable and should be approved. The Utility should file revised tariff sheets and a proposed customer notice to reflect the Commission-approved rates. The approved rates should be effective for service rendered on or after the stamped approval date on the tariff sheets pursuant to Rule 25-30.475(1), F.A.C. The approved rates should not be implemented until staff has approved the proposed customer notice and the notice has been received by customers. The Utility should provide proof of the date notice was given within 10 days of the date of the notice. A return on equity of 10.55 percent, with a range of plus or minus 100 basis points, should also be approved.
Issue 3:
Should the miscellaneous service charges requested by River Grove be approved?
Recommendation:
Yes. The Utility’s requested miscellaneous service charges of $30 and wastewater violation reconnection charge of actual cost should be approved. The Utility should file revised tariff sheets and a proposed customer notice to reflect the Commission-approved charges. The approved charges should be effective for services rendered on or after the stamped approval date on the tariff sheet provided customers have received notice pursuant to Rule 25-30.475(1), F.A.C. The Utility should provide proof of noticing within 10 days of rendering the approved notice. (Ramos)
Staff Analysis:
Section 367.091, F.S., authorizes the Commission to establish miscellaneous service charges. River Grove’s request was accompanied by its reason for requesting the charges as well as the cost justification required by Section 367.091(6), F.S. The Utility requested initial connection, normal reconnection, violation reconnection and premise visit charges of $30 during normal business hours. Additionally, the Utility requested that its violation reconnection charge for its wastewater system be actual cost, pursuant to Rule 25-30.460(1)(c), F.A.C.
The purpose of these charges is to place the burden for requesting or causing these services on the cost-causer rather than the general body of ratepayers. The Utility requested the recovery of $26.60 of field and supervisorial labor associated with processing miscellaneous services based on an hourly salary of $20 and the time it takes to perform all job functions, which is estimated to be 1.33 hours. Additionally, the Utility requested recovery of vehicle mileage of $3.48 based on a mileage rate of $0.58 per mile for 6 miles. The Utility’s cost justification for its requested miscellaneous service charges is shown in Table 3-1.
Table 3-1
Miscellaneous Service Charges Cost Justification
Labor ($20 x 1.33) |
$26.60 |
Vehicle ($0.58 x 6) |
$3.48 |
Total |
$30.08 |
Source:
Utility’s Cost Justification
Staff believes the Utility’s requested charges are reasonable and should be approved. A summary of the Utility’s requested miscellaneous service charges is shown in Table 3-2.
Table
3-2
Miscellaneous Service Charges
Initial Connection Charge |
$30.00 |
Normal Reconnection Charge |
$30.00 |
Violation Reconnection Charge (Water) |
$30.00 |
Violation Reconnection Charge (Wastewater) |
Actual Cost |
Premise Visit Charge |
$30.00 |
Source:
Utility’s Cost Justification
Based on the above, the Utility’s requested miscellaneous
service charges of $30, and wastewater violation reconnection charge of actual
cost, should be approved. The Utility should file revised tariff sheets and a
proposed customer notice to reflect the Commission-approved charges. The
approved charges should be effective for services rendered on or after the
stamped approval date on the tariff sheet provided customers have received
notice pursuant to Rule 25-30.475(1), F.A.C. The Utility should provide proof
of noticing within 10 days of rendering the approved notice.
Issue 4:
What is the appropriate late payment charge for River Grove?
Recommendation:
The appropriate late payment charge for River Grove is $7.50. The Utility should file revised tariff sheets and a proposed customer notice to reflect the Commission-approved charge. The approved charge should be effective for services rendered on or after the stamped approval date on the tariff sheet provided customers have received notice pursuant to Rule 25-30.475(1), F.A.C. The Utility should provide proof of noticing within 10 days of rendering the approved notice. (Ramos)
Staff Analysis:
River Grove requested a late payment charge of $7.50 to recover the cost of supplies and labor associated with processing late payment notices. River Grove’s request for a late payment charge was accompanied by its reason for requesting the charge as well as the cost justification, as required by Section 367.091, F.S. The goal of allowing late payment charges is two fold: first, it encourages customers to pay their bills on time, and second, if payments are not made on time, it ensures that the cost associated with collecting late payments are not passed on to the customers who do pay on time.[5]
Within its cost justification, the Utility included $5.00 for clerical labor associated with processing late payment based on the clerical employee who is paid $20 per hour and the amount of time it takes the employee to process a single late payment charge of 15 minutes. This is consistent with Commission practice, in which the Commission has found that 10 to 15 minutes is an appropriate amount of time for a billing employee to process a single late payment.[6] Furthermore, the Utility requested to recover supervisorial labor of $2.00 based on the supervisor’s hourly salary of $25 per hour and the time it takes the supervisor to review a late payment charge of five minutes, which is consistent with Utilities, Inc. of Florida’s approved late payment charge.[7] The Utility is also requesting recovery of $0.10 for supplies and $0.50 for postage. While the Utility’s cost justification totals to $7.60, the Utility rounded down its requested late payment charge to $7.50.
The Commission has recently approved late payment charges ranging from $4.50 to $7.15.[8] Staff understands that this late payment charge is slightly higher than what the Commission has approved in the past. However, after reviewing the Utility’s cost justification and comparing the cost break-down to other regulated water and wastewater utilities, staff believes the Utility’s requested charge is appropriate and should be approved. The cost justification for the Utility’s requested late payment charge is shown on Table 4-1.
Table 4-1
Late Payment Charge Cost Justification
Activity |
Cost |
Clerical Labor |
$5.00 |
Supervisor Labor |
$2.00 |
Supplies |
$0.10 |
Postage |
$0.50 |
Total Cost |
$7.60 |
Source:
Utility’s cost justification documentation.
Based on the above, the appropriate late payment charge for River Grove is $7.50. The Utility should file the revised tariff sheet and a proposed customer notice to reflect the Commission-approved charge. The approved charge should be effective for services rendered on or after the stamped approval date on the tariff sheet provided customers have received notice pursuant to Rule 25-30.475(1), F.A.C. The Utility should provide proof of noticing within 10 days of rendering the approved notice.
Issue 5:
Should River Grove be authorized to collect Non-Sufficient Funds Charge (NSF)?
Recommendation:
Yes. River Grove should be authorized to collect NSF charges. The Utility should file revised tariff sheets and a proposed customer notice to reflect the Commission-approved NSF charges. The approved charges should be effective for service rendered on or after the stamped approval date on the tariff sheets provided customers have received notice pursuant to Rule 25-30.475, F.A.C. The Utility should provide proof of noticing within 10 days of rendering its approved notice. (Ramos)
Staff Analysis:
Section 367.091, F.S., authorizes the Commission to establish miscellaneous service charges. Staff believes that River Grove should be authorized to collect NSF charges consistent with Section 68.065, F.S., which allows for the assessment of charges for the collection of worthless checks, drafts, or orders of payment. As currently set forth in Section 68.065(2), F.S., the following NSF charges may be assessed:
(1) $25, if the face value does not exceed $50,
(2) $30, if the face value exceeds $50 but does not exceed $300,
(3) $40, if the face value exceeds $300,
(4) or 5 percent of the face amount of the check, whichever is greater.
Approval of NSF charges is consistent with prior Commission decisions.[9] Furthermore, NSF charges place the cost on the cost-causer, rather than requiring that the costs associated with the return of the NSF checks to be spread across the general body of ratepayers. As such, River Grove should be authorized to collect NSF charges. The Utility should file revised tariff sheets and a proposed customer notice to reflect the Commission-approved NSF charges. The approved charges should be effective for service rendered on or after the stamped approval date on the tariff sheets provided customers have received notice pursuant to Rule 25-30.475, F.A.C. The Utility should provide proof of noticing within 10 days of rendering its approved notice.
Issue 6:
What are the appropriate initial customer deposits for River Grove?
Recommendation:
The appropriate initial customer deposits are $175 for water and $99 wastewater for the residential 5/8 inch x 3/4 inch meter size. The initial customer deposit for all other residential meter sizes and all general service meter sizes should be two times the average estimated bill. The approved customer deposits should be effective for connections made on or after the stamped approval date on the tariff sheets pursuant to Rule 25-30.475, F.A.C. The Utility should be required to collect the approved initial customer deposits until authorized to change them by the Commission in a subsequent proceeding. (Ramos)
Staff Analysis:
Rule 25-30.311, F.A.C., contains criteria for collecting, administering, and refunding customer deposits. Rule 25-30.311(1), F.A.C., requires that each company’s tariff contain its specific criteria for determining the amount of initial deposits. The Utility requested customer deposits of $156.84 for water and $149.82 for wastewater which was based on two months of average residential monthly bills and the Utility’s proposed rates. Customer deposits are designed to minimize the exposure of bad debt expense for the Utility and, ultimately, the general body of ratepayers. In addition, collection of customer deposits is consistent with one of the fundamental principles of rate making—ensuring that the cost of providing service is recovered from the cost-causer.
Rule 25-30.311(7), F.A.C., authorizes utilities to collect new or additional deposits from existing customers not to exceed an amount equal to the average actual charge for water and/or wastewater service for two billing periods for the 12-month period immediately prior to the date of notice. The two billing periods reflect the lag time between the customer’s usage and the utility’s collection of the revenues associated with that usage. Commission practice has been to set initial customer deposits equal to two months bills based on the average consumption for a 12-month period for each class of customers.[10] The Utility indicated that the average monthly residential usage is 7,330 gallons per customer. Therefore, the average residential monthly bill is approximately $87.33 for water and $49.29 wastewater service, based on staff’s recommended monthly rates in Issue 2.
Based on the above, the appropriate initial customer deposits are $175 for water and $99 wastewater for the residential 5/8 inch x 3/4 inch meter size. The initial customer deposit for all other residential meter sizes and all general service meter sizes should be two times the average estimated bill. The approved customer deposits should be effective for connections made on or after the stamped approval date on the tariff sheets pursuant to Rule 25-30.475, F.A.C. The Utility should be required to collect the approved initial customer deposits until authorized to change them by the Commission in a subsequent proceeding.
Issue 7:
Should River Grove’s requested meter installation charges be approved?
Recommendation:
Yes. The Utility’s requested meter installation charge of $353 for the 5/8 inch x 3/4 inch meter size and actual cost for all other meter sizes should be approved. The Utility should file revised tariff sheets and a proposed customer notice. River Grove should provide notice to potential customers who have requested service within 12 calendar months prior to the month the application was filed and up until this Order becomes final.[11] The approved charges should be effective for connections made on or after the stamped approval date on the tariff sheets. The Utility should provide proof of the date notice was given within 10 days of the date of notice. (Ramos)
Staff Analysis:
River Grove requested a meter installation charge of $353 for 5/8 inch x 3/4 inch meters and actual cost for all other meter sizes. The Utility’s requested charge of $353 is based on the estimated costs of the water meter and meter box ($203) and installation for the 5/8 inch x 3/4 inch meter size ($150). Pursuant to Section 367.101, F.S., the Commission shall set just and reasonable charges and conditions for service availability. The Utility’s requested meter installation charge is consistent with Commission practice and therefore, staff believes the Utility’s requested meter installation charges are appropriate.[12]
Based on the above, the Utility’s requested meter installation charge of $353 for the 5/8 inch x 3/4 inch meter size and actual cost for all other meter sizes should be approved. The Utility should file revised tariff sheets and a proposed customer notice. River Grove should provide notice to potential customers who have requested service within 12 calendar months prior to the month the application was filed and up until this Order becomes final. The approved charges should be effective for connections made on or after the stamped approval date on the tariff sheets. The Utility should provide proof of the date notice was given within 10 days of the date of notice.
Issue 8:
Should this docket be closed?
Recommendation:
If no person whose substantial interest are affected by the proposed agency action files a protest within 21 days of the issuance of the order, a consummating order should be issued. The docket should remain open for staff’s verification that the revised tariff sheets and customer notice have been filed by the Utility and approved by staff. Once these actions are complete, this docket should be closed administratively. (Schrader)
Staff Analysis:
If no person whose substantial interests are affected by the proposed agency action files a protest within 21 days of the issuance of the order, a consummating order should be issued. The docket should remain open for staff’s verification that the revised tariff sheets and customer notice have been filed by the Utility and approved by staff. Once these actions are complete, this docket should be closed administratively.
RIVER GROVE UTILITIES, INC.
Description of Water and Wastewater Service
Territory
Brevard County
A PORTION OF SECTION 14, TOWNSHIP
30 SOUTH, RANGE 38 EAST OF THE PUBLIC RECORDS OF BREVARD COUNTY, FLORIDA AND
BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
FOR A POINT OF BEGINNING, COMMENCE
AT THE SOUTHWEST CORNER OF SAID SECTION 14; THENCE NORTH 00 DEGREES 15 MINUTES
51 SECONDS EAST, ALONG THE WEST LINE OF SAID SECTION 14, A DISTANCE OF 3974.89
FEET; THENCE SOUTH 89"32'41" EAST, DEPARTING FROM SAID WEST LINE OF
SECTION 14, A DISTANCE OF 659.98 FEET; THENCE SOUTH 00"13'15 WEST, A
DISTANCE OF 649.93 FEET; THENCE SOUTH 89 DEGREES 31 MINUTES 52 SECONDS EAST, A
DISTANCE OF 659.54 FEET; THENCE NORTH 00 DEGREES 15 MINUTES 51 SECONDS EAST, A
DISTANCE OF 482.51 FEET; THENCE NORTH 89 DEGREES 32 MINUTES 41 SECONDS WEST. A
DISTANCE OF 301.95 FEET; THENCE NORTH 09 DEGREES 14 MINUTES 29 SECONDS WEST, A
DISTANCE OF 170.00 FEET; THENCE SOUTH 89 DEGREES 32 MINUTES 41 SECONDS EAST, A
DISTANCE OF 330.00 FEET; THENCE SOUTH 00 DEGREES 17 MINUTES 14 SECONDS WEST, A
DISTANCE OF 115.09 FEET; THENCE SOUTH 89 DEGREES 32 MINUTES 49 SECONDS EAST, A
DISTANCE OF 586.35 FEET TO A POINT LYING ON THE AFOREMENTIONED WEST RIGHT OF
WAY LINE OF FLORIDA EAST COAST RAILROAD, SAID POINT ALSO ON A CURVE, SAID CURVE
BEING CONCAVE SOUTHWESTERLY, HAVING A RADIUS OF 5679.65 FEET; THENCE
SOUTHEASTERLY ALONG SAID WEST RIGHT OF WAY LINE AND ALONG THE ARC OF SAID
CURVE, AN ARC DISTANCE OF 681.65 FEET, SAID ARC BEING SUBTENDED BY A CHORD
BEARING AND DISTANCE OF SOUTH 06 DEGREES 04 MINUTES 54 SECONDS EAST, 681.25
FEET TO A POINT ON SAID CURVE; THENCE SOUTH 89 DEGREES 29 MINUTES 18 SECONDS
EAST, DEPARTING FROM SAID WEST RIGHT OF WAY LINE OF FLORIDA EAST COAST
RAILROAD, A DISTANCE OF 1401.39 FEET TO THE INTERSECTION OF THE SOUTH LINE OF
THE NORTH 786.51 FEET OF GOVERNMENT LOTS 2 AND 5, IN SECTION 14, TOWNSHIP 30
SOUTH, RANGE 38 EAST, BREVARD COUNTY, FLORIDA AND THE WESTERLY RIGHT OF WAY LINE
OF U.S. HIGHWAY NO. 1, SAID POINT ALSO LYING ON A CURVE, SAID CURVE BEING
CONCAVE NORTHEASTERLY, HAVING A RADIUS OF 8672.41 FEET; THENCE SOUTHEASTERLY
ALONG SAID ARC AND ALONG SAID WESTERLY RIGHT OF WAY LINE, AN ARC DISTANCE OF
243.82 FEET, SAID ARC BEING SUBTENDED BY A CHORD BEARING AND DISTANCE OF SOUTH
23 DEGREES 51 MINUTES 29 SECONDS EAST, 243.81 FEET TO THE POINT OF TANGENCY OF
SAID CURVE; THENCE SOUTH 24 DEGREES 39 MINUTES 48 SECONDS EAST, ALONG SAID
WESTERLY RIGHT OF WAY LINE, A DISTANCE OF 186.37 FEET TO THE SOUTH LINE OF THE
NORTH 293.76 FEET OF THE SOUTH 448.49 FEET OF GOVERNMENT LOTS 2 AND 5, SECTION
14,
TOWNSHIP 30 SOUTH, RANGE 38 EAST,
BREVARD COUNTY, FLORIDA; THENCE NORTH 89 DEGREES 33 MINUTES 24 SECONDS WEST,
DEPARTING FROM SAID WESTERLY RIGHT OF WAY LINE AND ALONG SAID SOUTH LINE, A
DISTANCE OF 1562.71 FEET TO A POINT LYING ON THE WESTERLY RIGHT OF WAY LINE OF
FLORIDA EAST COAST RAILROAD; THENCE SOUTH 02 DEGREES 10 MINUTES 00 SECONDS
EAST, ALONG SAID WESTERLY RIGHT OF WAY LINE OF FLORIDA EAST COAST RAILROAD, A
DISTANCE OF 155.05 FEET; THENCE NORTH 89 DEGREES 10 MINUTES 00 SECONDS WEST,
DEPARTING FROM WESTERLY RIGHT OF WAY LINE OF FLORIDA EAST COAST RAILROAD, A
DISTANCE OF 685.05 FEET; THENCE SOUTH 00 DEGREES 15 MINUTES 51 SECONDS WEST, A
DISTANCE OF 2640.00 FEET TO A POINT LYING ON THE SOUTH LINE OF THE
AFOREMENTIONED SECTION 14; THENCE NORTH 89 DEGREES 32 MINUTES 41 SECONDS WEST,
ALONG SAID SOUTH LINE OF SAID SECTION 14, A DISTANCE OF 1320.01 FEET TO THE
SOUTHWEST CORNER OF SAID SECTION 14 AND THE POINT OF BEGINNING.
LANDS THUS DESCRIBED CONTAINS
6,245,117 SQUARE FEET OR 143.37 ACRES, MORE OR LESS, IN AREA.
FLORIDA PUBLIC SERVICE COMMISSION
authorizes
RIVER GROVE UTILITIES, INC.
pursuant to
Certificate Number 674 -W
to provide water service in Brevard County in accordance with the provisions of Chapter 367, Florida Statutes, and the Rule, regulations, and Orders of this Commission in the territory described by the Orders of this Commission. This authorization shall remain in force and effect until superseded, suspended, cancelled or revoked by Order of this Commission.
Order Number Date Issued Docket Number Filing Type
* * 20190147-WS Original Certificate
* Order Number and date to be provided at time of issuance.
FLORIDA PUBLIC SERVICE COMMISSION
authorizes
RIVER GROVE UTILITIES, INC.
pursuant to
Certificate Number 575 -S
to provide wastewater service in Brevard County in accordance with the provisions of Chapter 367, Florida Statutes, and the Rule, regulations, and Orders of this Commission in the territory described by the Orders of this Commission. This authorization shall remain in force and effect until superseded, suspended, cancelled or revoked by Order of this Commission.
Order Number Date Issued Docket Number Filing Type
* * 20190147-WS Original Certificate
* Order Number and date to be provided at time of issuance
River Grove Utilities,
Inc.
Monthly
Water and Wastewater Rates
Water
Service
Residential
and General Service |
|
|
Base Facility Charge – All Meter Sizes |
|
$34.92 |
|
|
|
Charge Per 1,000 gallons |
|
$7.15 |
Wastewater
Service |
||
|
|
|
Residential
and General Service |
|
|
Base Facility Charge - All Meter Sizes |
|
$24.66 |
|
|
|
Charge Per 1,000 gallons |
|
$3.36 |
No Cap |
|
|
[1]Order
Nos. PSC-2017-0059-PAA-WS, issued February 24, 2017, in Docket No. 20160220-WS,
In re: Application for original water and
wastewater certificates in Sumter County, by South Sumter Utility Company,
LLC.; PSC-2013-0484-FOF-WS, issued October 15, 2013, in Docket No.
20130105-WS, In re: Application for
certificates to provide water and wastewater service in Hendry and Collier
Counties, by Consolidated Services of Hendry & Collier, LLC; and PSC-2012-0224-PAA-WS, issued April 30,
2012, in Docket No. 20090445-WS, In re:
Application for original certificates for proposed water and wastewater system
and request for initial rates and charges in Indian River, Okeechobee, and St.
Lucie counties by Grove Land Utilities, LLC.
[2]Order No.
PSC-2018-0591-PAA-WS, issued December 19, 2018, in Docket No. 20180063-WS, In re: Application for limited proceeding
rate increase in Polk County by Orchid Springs Development Corporation; Order
No. PSC-2018-0552-PAA-WU, issued December 19, 2018, in Docket No. 20180022-WU, In re: Application for staff-assisted rate
case in Lake County by Pine Harbour Waterworks, Inc.
[3]Order No.
PSC-2019-0267-PAA-WS, issued July 1, 2019, in Docket No. 20190006-WS, In re: Water and wastewater industry annual
reestablishment of authorized range of return on common equity for water and
wastewater utilities pursuant to Section 367.081(4)(f), F.S.
[4]Order No.
PSC-2016-0537-PAA-WU, issued November 23, 2016, in Docket No. 20150181-WU, In re: Application for staff-assisted rate
case in Duval County by Neighborhood Utilities, Inc.
[5]Order Nos. PSC-2019-0047-PAA-WS, in Docket No.
20170249-WS, issued January 25, 2019, In re: Application for certificates to
provide water and wastewater service in Orange County by RSPI MHC, LLC; PSC-01-0998-TRF-WU,
issued April 23, 2001, in Docket No. 20010232-WU, In re: Request for approval of tariff filing to add "set
rate" late fee to water tariff, by Lake Yale Treatment Associates, Inc. in
Lake County.
[6]Order Nos. PSC-2019-0047-PAA-WS, in Docket No. 20170249-WS, issued January 25, 2019, In re: Application for certificates to provide water and wastewater service in Orange County by RSPI MHC, LLC; PSC-2018-0334-PAA-WU, issued June 28, 2018, in Docket No. 2017-155-WU, In re: Application for grandfather water certificate in Leon County and application for pass through increase of regulatory fees, by Seminole Waterworks, Inc.; PSC-16-0041-TRF-WU, in Docket No. 20150215-WU, issued January 25, 2016, In re: Request for approval of tariff amendment to include miscellaneous service charges for the Earlene and Ray Keen Subdivisions, the Ellison Park Subdivision and the Lake Region Paradise Island Subdivision in Polk County, by Keen Sales, Rentals and Utilities, Inc.; PSC-15-0569-PAA-WS in Docket No. 20140239-WS, issued December 16, 2015, In re: Application for staff-assisted rate case in Polk County by Orchid Springs Development Corporation.; PSC-16-0523-TRF-WU, in Docket No. 20160023-WU, issued November 21, 2016, In re: Application for transfer of majority organizational control of Sunny Shores Water Company, Inc., holder of Certificate No. 578- W in Manatee County, from Jack E. Mason to Jack E. Mason, II and Debbie A. Mason.
[7]Order No.
PSC-2017-0361-FOF-WS, in Docket No. 20160101-WS, issued September 25, 2017, In re: Application for increase in water and
wastewater rates in Charlotte, Highlands, Lake, Lee, Marion, Orange, Pasco,
Pinellas, Polk, and Seminole Counties by Utilities, Inc. of Florida.
[8]Order Nos. PSC-2019-0047-PAA-WS, in Docket No.
20170249-WS, issued January 25, 2019, In re: Application for certificates to
provide water and wastewater service in Orange County by RSPI MHC, LLC;
PSC-2018-0334-PAA-WU, issued June 28, 2018, in Docket No. 2017-155-WU, In
re: Application for grandfather water certificate in Leon County and
application for pass through increase of regulatory fees, by Seminole
Waterworks, Inc.; PSC-14-0105-TRF-WS, in Docket No. 20130288-WS, issued
February 20, 2014, In re: Request for
approval of late payment charge in Brevard County by Aquarina Utilities, Inc.; PSC-15-0535-PAA-WU
in Docket No. 20140217-WU, issued November 19, 2015, In re: Application for staff-assisted rate case in Sumter County by
Cedar Acres, Inc.; PSC-15-0569-PAA-WS, issued December 16, 2015, in Docket
No. 20140239-WS, In re: Application for
limited proceeding rate increase in Polk County by Orchid Springs Development
Corporation.
[9]Order Nos. PSC-2019-0047-PAA-WS, in Docket No. 20170249-WS, issued January 25, 2019, In re: Application for certificates to provide water and wastewater service in Orange County by RSPI MHC, LLC; PSC-2018-0334-PAA-WU, issued June 28, 2018, in Docket No. 2017-155-WU, In re: Application for grandfather water certificate in Leon County and application for pass through increase of regulatory fees, by Seminole Waterworks, Inc.; PSC-14-0198-TRF-SU, issued May 2, 2014, in Docket No. 20140030-SU, In re: Request for approval to amend Miscellaneous Service charges to include all NSF charges by Environmental Protection Systems of Pine Island, Inc.; and PSC-13-0646-PAA-WU, issued December 5, 2013, in Docket No. 20130025-WU, In re: Application for increase in water rates in Highlands County by Placid Lakes Utilities, Inc.
[10]Order Nos. PSC-2019-0047-PAA-WS, in Docket No. 20170249-WS, issued January 25, 2019, In re: Application for certificates to provide water and wastewater service in Orange County by RSPI MHC, LLC; PSC-2018-0334-PAA-WU, issued June 28, 2018, in Docket No. 2017-155-WU, In re: Application for grandfather water certificate in Leon County and application for pass through increase of regulatory fees, by Seminole Waterworks, Inc.; PSC-2017-0428-PAA-WS, issued November 7, 2017, in Docket No. 20160195-WS, In re: Application for staff-assisted rate case in Lake County by Lakeside Waterworks, Inc. and PSC-17-0113-PAA-WS, issued March 28, 2017, in Docket No. 20130105-WS, In re: Application for certificates to provide water and wastewater service in Hendry and Collier Counties, by Consolidated Services of Hendry & Collier, LLC
[11]Order Nos. PSC-2019-0223-PAA-SU, issued June 3, 2019, in Docket No. 20190075-SU, In re: Revision of wastewater service availability charges for Ni Florida in Pasco County.
[12] Order
Nos. PSC-2018-0271-PAA-WS, issued May 30, 2018, in Docket No. 20160220-WS, In
re: Application for original water and wastewater certificates in Sumter
County, by South Sumter Utility Company, LLC. PSC-2016-0169-PAA-WU, issued
April 28, 2016, in Docket No. 20150166-WU, In
re: Application for transfer of water system and Certificate No. 654-W in Lake
County from Black Bear Reserve Water Corporation to Black Bear Waterworks, Inc.
and PSC-2017-0209-PAA-WU, issued May 30, 2017, in Docket No. 20160065-WU, In re: Application for increase in water
rates in Charlotte County by Bocilla Utilities, Inc.