DATE:

September 24, 2026

TO:

Office of Commission Clerk (Teitzman)

FROM:

Division of Economics (Ward)

Office of the General Counsel (Farooqi)

RE:

Docket No. 20260136-GU – Petition for approval of 2025 true-up, projected 2026 true-up; and 2027 revenue requirements and surcharges associated with cast iron/bare steel pipe replacement rider; and request to extend rider from 1/28 through 12/31, by Peoples Gas System, Inc.

AGENDA:

10/06/26 – Regular Agenda – Tariff Suspension – Participation is at the Commission’s Discretion

COMMISSIONERS ASSIGNED:

All Commissioners

PREHEARING OFFICER:

Administrative

CRITICAL DATES:

10/31/26 (60-Day Suspension Date)

SPECIAL INSTRUCTIONS:

None

 

 Case Background

On September 1, 2026, Peoples Gas System, Inc. (Peoples) filed a petition for approval of the 2025 true-up, projected 2026 true-up, and the 2027 revenue requirement and surcharges associated with the cast iron/bare steel (CI/BSR) pipe replacement rider. Additionally, Peoples is requesting to extend the rider from January 1, 2028 to December 31, 2031. The rider was originally approved by Order No. PSC-12-0476-TRF-GU (2012 Order) to recover the cost of accelerating the replacement of cast iron and bare steel pipes through a surcharge on customers’ bills.[1] As established by the 2012 Order, Peoples would roll replaced infrastructure into rate base during a rate case, and the CI/BSR surcharge would be “reset to zero.”[2] The surcharge is set to terminate when all applicable CI/BSR pipes have been replaced and included in rate base. Since the 2012 Order was issued, investments have been rolled into rate base at the end of every rate case.

By Order No. PSC-17-0066-AS-GU, the Commission approved a comprehensive settlement agreement (2017 Agreement) between Peoples and the Office of Public Counsel.[3] The 2017 Agreement, in part, added problematic plastic pipe (PPP) installed in the company's distribution system to eligible replacements under the rider beginning in 2017 and continuing through December 31, 2027. PPP was manufactured before 1983 and has significant safety concerns. In certain areas, the PPP is interspersed with, or connected to, the cast iron/bare steel pipe that is being replaced under the rider. As provided for in the 2017 Agreement, PPP replacements are included in the calculation of the 2027 rider surcharges.

Peoples’ last rate case was in 2025 and it settled with a stipulation and settlement agreement (2025 Agreement), which was approved by Order No. PSC-2025-0413-S-GU.[4] Pursuant to paragraph 3(a) of the 2025 Agreement, $6,733,295 of CI/BSR revenues were transferred into base rates. Additionally, pursuant to paragraph 5(b) of the 2025 Agreement, Peoples is prohibited from seeking recovery through the CI/BSR of PPP costs associated with the Tampa Downtown project or any other PPP costs included for recovery in the 2025 rate case filing.

As part of its petition in the instant docket, Peoples is requesting Commission approval of the final true-up amount for the calendar year of 2025 of $473,480 over-recovery (including interest). Additionally, Peoples is requesting an estimated end of period total true-up for 2026 of an over-recovery of $2,013,859, and projected capital expenditures for replacement during 2027 of $75,992,318. Peoples is requesting approval of revised CI/BS replacement rider surcharges that would go into effect January 1, 2027. Peoples’ current surcharges were approved by Order No. PSC-2025-0451-TRF-GU.[5]

This is staff’s recommendation to suspend the proposed tariffs. The Commission has jurisdiction over this matter pursuant to Sections 366.04, 366.05, and 366.06, Florida Statutes (F.S.).

 

 


Discussion of Issues

Issue 1: 

 Should the Commission suspend Peoples’ proposed CI/BSR rates and associated tariff for the period January through December 2027?

Recommendation: 

 Yes. Staff recommends that Peoples’ proposed CI/BSR rates and associated tariff for the period January through December 2027 be suspended to allow staff sufficient time to review the petition and gather all pertinent information in order to present the Commission with an informed recommendation on the tariff proposal. (Ward)

Staff Analysis: 

 Staff recommends that Peoples’ proposed CI/BSR rates and associated tariff for the period January through December 2027 be suspended to allow staff sufficient time to review the petition and gather all pertinent information in order to present the Commission with an informed recommendation on the tariff proposal.

Pursuant to Section 366.06(3), F.S., the Commission may withhold consent to the operation of all or any portion of a new rate schedule, delivering to the utility requesting such a change a reason or written statement of good cause for doing so within 60 days. Staff believes that the reason stated above is a good cause consistent with the requirements of Section 366.06(3), F.S.


Issue 2: 

 Should this docket be closed?

Recommendation: 

 No. This docket should remain open pending the Commission’s decision on the proposed tariffs. (Farooqi)

Staff Analysis: 

 This docket should remain open pending the Commission’s decision on the proposed tariffs.

 



[1] Order No. PSC-12-0476-TRF-GU, issued September 18, 2012, in Docket No. 20110320-GU, In re: Petition for approval of Cast iron/Bare Steel Pipe Replacement Rider (Rider CI/BSR), by Peoples Gas System.

[2] Id., p. 3.

[3] Order No. PSC-17-0066-AS-GU, issued February 28, 2017, in Docket No. 20160159-GU, In re: Petition for approval of settlement agreement pertaining to Peoples Gas System’s 2016 depreciation study, environmental reserve account, problematic plastic pipe replacement, and authorized ROE.

[4] Order No. PSC-2025-0413-S-GU, issued October 31, 2025, in Docket No. 20250029-GU, In re: Petition for rate increase, by Peoples Gas System, Inc.

[5] Order No. PSC-2025-0451-TRF-GU, issued December 12, 2025, in Docket No. 20250106-GU, In re: Petition for approval of 2024 true-up, projected 2025 true-up, and 2026 revenue requirements and surcharges associated with cast iron/bare steel pipe replacement rider, by Peoples Gas System.