State of Florida

 

Public Service Commission

Capital Circle Office Center ● 2540 Shumard Oak Boulevard
Tallahassee, Florida 32399-0850

-M-E-M-O-R-A-N-D-U-M-

 

DATE:

November 17, 2026

TO:

Office of Commission Clerk (Teitzman)

FROM:

Division of Economics (Kelley)

Office of the General Counsel (Marquez)

RE:

Docket No. 20260134-GU – Petition for approval of safety, access, and facility enhancement program true-up and 2027 cost recovery factors, by Florida City Gas.

AGENDA:

12/01/26 – Regular Agenda – Tariff Filing – Interested Persons May Participate

COMMISSIONERS ASSIGNED:

All Commissioners

PREHEARING OFFICER:

Administrative

CRITICAL DATES:

05/03/27 (8-Month Effective Date)

SPECIAL INSTRUCTIONS:

None

 

 Case Background

On September 1, 2026, Florida City Gas (FCG or Utility) filed a petition for approval of its Safety, Access, and Facility Enhancement (SAFE) program true-up and 2027 cost recovery factors. By Order No. PSC-15-0390-TRF-GU (2015 Order), the Commission approved FCG’s 10-year SAFE program which allows recovery of the cost of relocating on an expedited basis certain existing gas mains and associated facilities from rear lot easements to the street front.[1] In the 2015 Order, the Commission found that the relocation of mains and services to the street front provided for more direct access to the facilities and enhanced the level of service provided to all customers through improved safety and reliability. The SAFE factor is a fixed surcharge on customers’ bills.

 

In the 2015 Order, the Commission required FCG to file an annual petition, beginning in 2016, for review and resetting of the SAFE factors to true-up any prior over- or under-recovery and to set the surcharge for the coming year. The SAFE program was originally approved as a 10-year program and was planned to finish in 2025. However, during FCG’s 2022 rate case, the Commission not only approved the continuation of the SAFE program beyond its 2025 expiration date but also the program’s expansion to include the relocation of an additional approximately 150 miles of mains and services and the replacement of approximately 160 miles of “orange pipe.”[2]

In 2024, the Commission approved FCG’s petition to modify its SAFE program to include replacing span pipes, burying shallow and exposed pipeline, and replacing obsolete pipe and related facilities.[3] The total estimated cost for the program modifications was $49.8 million over a ten-year period.[4] The additional program modifications are included in this proceeding for recalculation of the SAFE surcharges. The current 2026 SAFE factors were approved by Order No. PSC-2025-0458-TRF-GU.[5]

In FCG’s rate case, Docket No. 20260026-GU, FCG proposed to transfer FCG’s SAFE investments as of December 31, 2026, into base rates. Therefore, in this petition, FCG only proposed for recovery any true up amounts and SAFE investments above the amount being transferred to base rates, resulting in a reduction of the proposed 2027 SAFE factors. Also in FCG’s rate case, the Utility proposed to consolidate the residential rate classes and to restructure the commercial rate schedules. The rate case docket is currently scheduled to be addressed at the December 1, 2026 Agenda Conference.

By Order No. PSC-2026-0375-PCO-GU, the Commission suspended the proposed tariffs to allow staff sufficient time to analyze the Utility’s filing, pursuant to Section 366.06(3), Florida Statutes (F.S.). Commission staff issued its first data request to FCG on September 14, 2026, for which FCG provided a response on September 29, 2026.

FCG’s annual progress in the SAFE program is shown in Attachment A to the recommendation. The proposed 2027 SAFE factors are shown in Attachment B to the recommendation on Ninth Revised Sheet No. 79. The Commission has jurisdiction over this matter pursuant to Sections 366.04, 366.041, 366.05, and 366.06, F.S.


Discussion of Issues

Issue 1: 

 Should the Commission approve FCG’s proposed SAFE tariffs for the period January through December 2027?

Recommendation: Yes. The Commission should approve FCG’s proposed SAFE tariff for the period January through December 2027. After reviewing FCG’s filings and supporting documentation, the calculations of the 2027 SAFE factors appear consistent with the methodology approved in the 2015 Order and are reasonable and accurate.

 If the Commission approves the consolidation of the residential rate classes and the restructuring of the commercial rate classes in rate case Docket No. 20260026-GU, then FCG should refile its SAFE tariff for  administrative approval by staff to reflect the restructured rate classes. (Kelley)

Staff Analysis: 

As required by the 2015 Order, the Utility’s calculations for the 2027 revenue requirement and SAFE factors include a final true-up for 2025, an estimated/actual true-up for 2026, and projected costs for 2027. During 2026, FCG replaced 14 miles of mains and 705 services as shown in Attachment A to the petition. FCG also replaced 21.8 miles of mains and 1,589 services associated with orange pipe in 2026.

In Attachment B to its petition, the Utility provided a description of the SAFE program projects undertaken in 2025 and 2026 and forecast for 2027. In response to staff’s First Data Request, FCG explained that it prioritizes its replacement projects based on a risk assessment and to complete all projects in a cost-effective manner the Utility uses a competitive bidding process.[6] FCG stated that work is awarded based on lowest bid, capacity to complete the work, and historical performance. FCG further explained that due to limited internal resources it utilizes contract labor to complete the replacement work.

Final True-ups for 2025

FCG stated that the revenues collected for 2025 were $7,192,482 compared to a revenue requirement of $8,697,649 resulting in an under-recovery of $1,505,167. Adding in the 2024 final under-recovery of $865,219, including interest, results in a final 2025 under-recovery of $2,422,508.[7]

Actual/Estimated 2026 True-up

FCG provided actual revenues for January through June 2026 and forecasted revenues for July through December 2026, totaling $14,264,313 as compared to a projected revenue requirement of $12,775,274, resulting in an over-recovery of $1,489,039. Adding the 2025 under-recovery of $2,422,510 to the 2026 over-recovery of $1,489,039, this results in total 2026 true-up, including interest, is an under-recovery of $995,506.

 

Projected 2027 Costs

The Utility’s projected average net investment for 2027 is $33,116,902 for its SAFE program. The revenue requirement, which includes a return on investment, depreciation, and taxes is $2,490,603. The return on investment calculation includes federal income taxes, regulatory assessment fees, and bad debt. After adding the 2026 under-recovery, the total 2027 revenue requirement is $3,486,109. Table 1-1 displays the projected 2027 SAFE program revenue requirement calculation.

Table 1-1

2027 SAFE Program Revenue Requirements Calculation

2027 Projected Average Net Investment

$33,116,902

Return on Investment

1,802,603

Depreciation Expense

339,046

Property Tax Expense

348,954

2027 Revenue Requirement

$2,490,603

Plus 2026 Under-recovery

995,506

Total 2027 Revenue Requirement

$3,486,109

Source: Attachment C, Schedule 4 of the petition.

Proposed 2026 SAFE Factors

The SAFE factors are fixed monthly charges. FCG’s cost allocation methodology was approved in the 2015 Order and was used in the instant filing. The approved methodology allocates the current cost of a 2-inch pipe to all customers on a per customer basis and allocates the incremental cost of replacing a 4-inch pipe to customers who use over 6,000 therms per year. For customers who require 4-inch pipes, the cost takes into account that the minimum pipe is insufficient to serve their demand, and therefore, allocates an incremental per foot cost in addition to the all-customer cost. The resulting allocation factors are applied to the 2027 total revenue requirement to develop the monthly SAFE factors.

Because the methodology is based on the size on the pipe and commercial customer therm use, the restructuring of commercial customer schedules should have little to no effect in changing the revenue requirement. Any change would be trued-up in next year’s SAFE docket.

The proposed fixed monthly SAFE factor is $2.16 for customers using less than 6,000 therms per year (compared to the current factor of $8.70). The proposed fixed monthly SAFE factor for customers using more than 6,000 therms per year is $2.74 (compared to the current factor of $11.01). FCG stated that it will provide notice to customers of the approved 2027 SAFE factors through a customer bill message and update the rate schedules posted online.

Conclusion

The Commission should approve FCG’s proposed SAFE tariff for the period January through December 2027. After reviewing FCG’s filings and supporting documentation, the calculations of the 2027 SAFE factors appear consistent with the methodology approved in the 2015 Order and are reasonable and accurate.

 If the Commission approves the consolidation of the residential rate classes and the restructuring of the commercial rate classes in rate case Docket No. 20260026-GU, then FCG should refile its SAFE tariff  for  administrative approval by staff to reflect the restructured rate classes.
Issue 2: 

 Should this docket be closed?

Recommendation: 

 If a protest is filed within 21 days of the issuance of the order by a person whose substantial interests are affected, the tariff should remain in effect, with any revenues held subject to refund, pending resolution of the protest. If no timely protest is filed, this docket should be closed upon the issuance of a consummating order. (Marquez)

Staff Analysis: 

 If a protest is filed within 21 days of the issuance of the order by a person whose substantial interests are affected, the tariff should remain in effect, with any revenues held subject to refund, pending resolution of the protest. If no timely protest is filed, this docket should be closed upon the issuance of a consummating order.


 

                         




[1] Order No. PSC-15-0390-TRF-GU, issued September 15, 2015, in Docket No. 20150116-GU, In re: Petition for approval of safety, access, and facility enhancement program and associated cost recovery methodology, by Florida City Gas.

[2] Order No. PSC-2023-0177-FOF-GU, issued June 9, 2023, in Docket No. 20220069-GU, In re: Petition for rate increase by Florida City Gas, p. 72. “Orange pipe” is a specific plastic material used in the 1970s and 1980s that was studied by the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration and shown through industry research to exhibit premature failure in the form of cracking. Id.

[3] Order No. PSC-2024-0438-PAA-GU, issued October 2, 2024, in Docket No. 20240071-GU, In re: Petition for approval of safety, access, and facility enhancement program modifications, by Florida City Gas.

[4] Id. at 4.

[5] Order No. PSC-2025-0458-TRF-GU, issued December 17, 2025, in Docket No. 20250111-GU, In re: Petition for approval of safety, access, and facility enhancement program true-up and 2026 cost recovery factors, by Florida City Gas.

[6] Document No. 07062-2026, pp. 2–3.

[7] Due to rounding, the total amount in Attachment C, Schedule 2 comes out to $2,422,508, rather than $2,422,510 when calculated.