State of Florida

pscSEAL

 

Public Service Commission

Capital Circle Office Center ● 2540 Shumard Oak Boulevard
Tallahassee, Florida 32399-0850

-M-E-M-O-R-A-N-D-U-M-

 

DATE:

November 17, 2026

TO:

Office of Commission Clerk (Teitzman)

FROM:

Division of Economics (Hampson)

Office of the General Counsel (Marquez)

RE:

Docket No. 20260133-GU – Petition for approval of GUARD true-up cost recovery factors, by Florida Public Utilities Company.

AGENDA:

12/01/26 – Regular Agenda – Tariff Filing – Interested Persons May Participate

COMMISSIONERS ASSIGNED:

All Commissioners

PREHEARING OFFICER:

Administrative

CRITICAL DATES:

05/03/27 (8-Month Effective Date)

SPECIAL INSTRUCTIONS:

None

 

 Case Background

On September 1, 2026, Florida Public Utilities Company (FPUC) filed a petition for approval of its Gas Utility Access and Replacement Directive (GUARD) cost recovery factors for the period January through December 2027. By Order No. PSC-2023-0235-PAA-GU (2023 Order), the Commission approved FPUC’s 10-year GUARD program, consisting of (1) replacement of problematic pipes and facilities and (2) relocation of mains and service lines located in rear easement and other difficult to access areas to the front lot easements.[1] The 2023 Order allows FPUC to recover the revenue requirements of expedited programs to replace problematic pipes and facilities and enhance the safety and accessibility of portions of FPUC’s natural gas distribution system through a monthly surcharge on customers’ bills.

The Commission further ordered FPUC to: (1) include all calculations to show a final true-up, actual-estimated true-up, projected year investments and associated revenue requirements, and the calculations of the GUARD factors by rate class; (2) provide a report including the location, date, description, and associated costs of all replacement projects completed and all projects scheduled for the following year; and (3) include any remaining Gas Replacement and Infrastructure Program (GRIP) over- or under-recovery in the GUARD cost recovery. The methodology to calculate the GUARD program surcharges is the same that was approved for FPUC’s concluded GRIP.[2] The Commission approved FPUC’s 2026 GUARD factors in Order No. PSC-2025-0450-TRF-GU.[3]

By Order No. PSC-2026-0374-PCO-GU, the Commission suspended FPUC’s revised 2027 GUARD tariff.[4] Staff issued one data request to FPUC on September 29, 2026, for which responses were received October 13, 2026.[5] This is staff’s final recommendation on the proposed tariffs for FPUC’s 2027 GUARD factors. Included in this recommendation are Attachment A - list of GUARD projects for 2025–2027 Actual/Forecast, and Attachment B - Fourth Revised Tariff Sheet No. 7.403 legislative version. The Commission has jurisdiction over this matter pursuant to Sections 366.04, 366.041, 366.05, and 366.06, Florida Statutes (F.S.).

 


Discussion of Issues

Issue 1: 

 Should the Commission approve FPUC’s 2027 GUARD cost recovery factors and associated tariff sheet for the period January to December 2027?

Recommendation: 

 Yes. The Commission should approve FPUC’s 2027 GUARD cost recovery factors and associated Fourth Revised Tariff Sheet No. 7.403, included in Attachment B to this recommendation, to be effective for the first billing cycle of January 2027 through the last billing cycle of December 2027. After reviewing FPUC’s filings and supporting documentation, the calculations of the 2027 GUARD factors appear consistent with the methodology approved in the 2023 Order and are reasonable and accurate. (Hampson)

 

Staff Analysis: 

 The GUARD program is driven by risks identified under FPUC’s Distribution Integrity Management Program and risk assessments performed by an independent contractor.  As stated by witness Dayton and in responses to staff’s First Data Request, the GUARD projects are based upon risk assessment categorized as high, medium, and low risk, by an independent contractor. Projects in high consequence areas and those of high risk continue to be a priority. The prioritized projects for 2026 and 2027 are included in Attachment A to this recommendation.

FPUC’s True-Ups by Year

FPUC’s calculation for the 2027 GUARD revenue requirement includes a final true-up for 2025, actual/estimated true-up for 2026, and projected costs for 2027.

Final 2025 GUARD True-Up

Witness Dayton states that the January through December 2025 true-up resulted in an under-recovery of $829,663, inclusive of interest. As shown in Schedule C-1 of the petition, the 2024 ending balance was an under-recovery of $701,549. Combined with the 2025 under-recovery of $115,206, and year-end monthly interest expense of $12,907 associated with any over- and under-recoveries results in a final 2025 under-recovery of $829,663.

Actual/Estimated 2026 GUARD True-Up

As shown in Schedule C-2, the 2026 actual (January through June) and forecasted (July through December) GUARD true-up is an over-recovery of $590,622 (inclusive of interest), resulting in an overall under-recovery of $239,042.[6] As shown in Table 1-1 below, this under-recovery is applied to the 2027 GUARD revenue requirement, resulting in a higher revenue requirement to be recovered from customers in 2027.

Projected 2027 GUARD Revenue Requirement

For 2027, FPUC plans to invest $25,419,383 ($19,553,425 for mains, $5,030,958 for service lines, and $835,000 for meters), resulting in a total qualified investment of $142,804,193 (including the year-end 2026 investment). The GUARD program revenue requirement, which includes a return on investment, depreciation expense, extending customer-owned fuel lines (to connect to meters which require to be relocated due to safety issues), customer notification expense, and property taxes, is $13,959,191. All expenses are dependent upon the level of investment costs. After adding the 2026 under-recovery true-up amount of $239,042, the 2027 GUARD revenue requirement to be recovered through the proposed surcharges is $14,198,233.

Table 1-1

2027 GUARD Revenue Requirement Calculation

2027 Total Qualified Investment

$142,804,193

2027 Return on Investment

$9,411,098

Depreciation Expenses

$2,169,370

Fuel Line Expenses

$132,000

Property/Ad Valorem Tax Expense

$2,171,616

Customer Notification Expense

$75,107

2027 Net GUARD Revenue Requirement

$13,959,191

Plus 2026 Under-Recovery

$239,042

2027 Total Revenue Requirement

$14,198,233

Source: Witness Dayton’s Testimony Exhibit BD-1, Schedule C-2, Page 4 of 7.

Proposed 2027 GUARD Surcharges

As approved in the 2023 Order, the total 2027 revenue requirement is allocated to the rate classes using the same methodology used for the allocation of mains and service lines in the cost of service study used in the Company’s most recent rate case. The respective percentages were multiplied by the 2027 revenue requirement and divided by each rate class’s projected therm sales to provide the GUARD surcharge for each rate class. The Commission initially approved the methodology by Order No. PSC-12-0490-TRF-GU when approving FPUC’s GRIP.[7]

In 2026, the monthly bill impact was $5.20 for a residential customer using 20 therms per month. The proposed 2027 GUARD surcharge for FPUC’s residential customers who use 20 therms a month on the Residential Service tariff (RES-2) would pay $0.37704 per therm compared to the 2026 GUARD surcharge of $0.26015 per therm. The monthly bill impact for 2027 would be $7.54 for a residential customer using 20 therms per month.

Conclusion

The Commission should approve FPUC’s 2027 GUARD cost recovery factors and associated Fourth Revised Tariff Sheet No. 7.403, included in Attachment B to this recommendation, to be effective for the first billing cycle of January 2027 through the last billing cycle of December 2027. After reviewing FPUC’s filings and supporting documentation, the calculations of the 2027 GUARD factors appear consistent with the methodology approved in the 2023 Order and are reasonable and accurate.


Issue 2: 

 Should this docket be closed?

Recommendation: 

 If a protest is filed within 21 days of the issuance of the order by a person whose substantial interests are affected, the tariff should remain in effect, with any revenues held subject to refund, pending resolution of the protest. If no timely protest is filed, this docket should be closed upon the issuance of a consummating order. (Marquez)

Staff Analysis: 

 If a protest is filed within 21 days of the issuance of the order by a person whose substantial interests are affected, the tariff should remain in effect, with any revenues held subject to refund, pending resolution of the protest. If no timely protest is filed, this docket should be closed upon the issuance of a consummating order.


Table

AI-generated content may be incorrect.


A picture containing table

AI-generated content may be incorrect.



[1] Order No. PSC-2023-0235-PAA-GU, issued August 15, 2023, amended by Order No. PSC-2023-0235A-PAA-GU, issued August 18, 2023, in Docket No. 20230029-GU, In re: Petition for approval of gas utility access and replacement directive, by Florida Public Utilities Company.

[2] Order No. PSC-12-0490-TRF-GU, issued September 24, 2012, in Docket No. 120036-GU, In re: Joint petition for approval of Gas Reliability Infrastructure Program (GRIP) by Florida Public Utilities Company and the Florida Division of Chesapeake Utilities Corporation.

[3] Order No. PSC-2025-0450-TRF-GU, issued December 11, 2025, in Docket No. 20250109-GU, In re: Petition for approval of gas utility access and replacement directive cost recovery factors for January 2026 through December 2026, by Florida Public Utilities Company.

[4] Order No. PSC-2026-0374-PCO-GU, issued October 26, 2026, in Docket No. 20260133-GU, In re: Petition for approval of GUARD true-up cost recovery factors, by Florida Public Utilities Company.

[5] Document No. 07325-2026.

[6] The 2026 overall under-recovery does not add due to rounding.

[7] Order No. PSC-12-0490-TRF-GU, issued September 24, 2012, in Docket No. 120036-GU, In re: Joint petition for approval of Gas Reliability Infrastructure Program (GRIP) by Florida Public Utilities Company and the Florida Division of Chesapeake Utilities Corporation.